The project Refurbishment and Electrification of Car Park P2 Main works: Project owner Groupe ADP AÉROPORT DE PARIS – ORLY 94390 ORLY Key figures 2022 – 202719 000 000 € H.T. Project management team Representative: MANING Area 90,000 m² – 3,000 parking spaces Mission Electrical Project Management: design and supervision of works

Logistics
Electrical Engineering

The project

Refurbishment and Electrification of Car Park P2

Main works:

  • Standard Lighting / Safety Lighting
  • Electric vehicle charging points
  • Access Control / CCTV
  • In-seat guidance system
  • Bringing electrical installations up to standard

Groupe ADP

AÉROPORT DE PARIS – ORLY

94390 ORLY

2022 – 2027
19 000 000 € H.T.

Representative: MANING

90,000 m² – 3,000 parking spaces